Zobrazit vše

Viz anglická verze jako naši oficiální verzi.Vrátit se

Evropa
France(Français) Germany(Deutsch) Italy(Italia) Russian(русский) Poland(polski) Czech(Čeština) Luxembourg(Lëtzebuergesch) Netherlands(Nederland) Iceland(íslenska) Hungarian(Magyarország) Spain(español) Portugal(Português) Turkey(Türk dili) Bulgaria(Български език) Ukraine(Україна) Greece(Ελλάδα) Israel(עִבְרִית) Sweden(Svenska) Finland(Svenska) Finland(Suomi) Romania(românesc) Moldova(românesc) Slovakia(Slovenská) Denmark(Dansk) Slovenia(Slovenija) Slovenia(Hrvatska) Croatia(Hrvatska) Serbia(Hrvatska) Montenegro(Hrvatska) Bosnia and Herzegovina(Hrvatska) Lithuania(lietuvių) Spain(Português) Switzerland(Deutsch) United Kingdom(English)
Asie/Pacifik
Japan(日本語) Korea(한국의) Thailand(ภาษาไทย) Malaysia(Melayu) Singapore(Melayu) Vietnam(Tiếng Việt) Philippines(Pilipino)
Afrika, Indie a Střední východ
United Arab Emirates(العربية) Iran(فارسی) Tajikistan(فارسی) India(हिंदी) Madagascar(malaɡasʲ)
Jižní Amerika / Oceánie
New Zealand(Maori) Brazil(Português) Angola(Português) Mozambique(Português)
Severní Amerika
United States(English) Canada(English) Haiti(Ayiti) Mexico(español)
domůproduktyVývojové desky, sady, programátoryHodnocovací desky - snímačeTMP126EVM
TMP126EVM Image
Obrázek může být reprezentace.
Viz specifikace pro podrobnosti o produktu.
VYJáDřIT MOžNOST
Metoda platby

TMP126EVM - Texas Instruments

Výrobce Part Number
TMP126EVM
Výrobce
Texas Instruments
Allelco Part Number
98D-TMP126EVM
Záruka
1 rok záruka Allelco - Zjistěte více
Popis dílů
EVAL BOARD FOR TMP126
Balík
Box
Datový list
1.TMP126EVM.pdf ...

Datasheets

TMP126EVM.pdf
Stav RoHs
Komf
Naše certifikace
Na skladě: 43023
  • Jednotková cena: $106.98
  • Mezisoučet: $0.00

Chcete lepší cenu?
Přidat do vozíku a odeslat RFQ Nyní vás okamžitě kontaktujeme.

Množství Jednotková cena Ext.Cena
1+ $106.98 $106.98
200+ $42.69 $8,538.00
500+ $41.26 $20,630.00
1000+ $40.55 $40,550.00
Výše uvedené ceny nezahrnují daně a sazby přepravy, které budou vypočteny na stránkách objednávek.
VYJáDřIT MOžNOST
Metoda platby
Naše certifikace

Specifikace

Technické specifikace TMP126EVM
Technické specifikace Texas Instruments - TMP126EVM, atributy, parametry a části s podobnými specifikacemi jako Texas Instruments - TMP126EVM

Atribut produktu Hodnota atributu  
Výrobce Texas Instruments  
Napětí - Supply 1.62V ~ 5.5V  
Využívány IC / Part MSP430F5528, TMP126  
dodávané Obsah Board(s), Cable(s)  
Série -  
Typ senzoru Temperature  
Atribut produktu Hodnota atributu  
Citlivost ±0.5°C  
Dosah -55°C ~ 175°C  
Balík Box  
Poznámka -  
Rozhraní I2C, Serial, SPI  
Embedded Yes, MCU, 16-Bit  

Klasifikace životního prostředí a vývozu

ATRIBUT POPIS
Stav RoHs Komf
Úroveň citlivosti na vlhkost (MSL) 1 (Unlimited)
Dosáhnout stavu REACH Unaffected
ECCN EAR99
HTSUS 8473.30.1180

Díly s podobnými specifikacemi

Tři části napravo mají podobné specifikace jako Texas Instruments TMP126EVM.

Atribut produktu TMP126EVM TMP13N50 TMP141AIDBVT TMP125AIDBVT
Part Number TMP126EVM TMP13N50 TMP141AIDBVT TMP125AIDBVT
Výrobce Texas Instruments TRINNO Texas Instruments Texas Instruments
Využívány IC / Part MSP430F5528, TMP126 - - -
Embedded Yes, MCU, 16-Bit - - -
Napětí - Supply 1.62V ~ 5.5V - - 2.7V ~ 5.5V
Citlivost ±0.5°C - - -
Typ senzoru Temperature - - Digital, Local
Dosah -55°C ~ 175°C - - -
Balík Box - - Tape & Reel (TR)
Rozhraní I2C, Serial, SPI - - -
Poznámka - - - -
dodávané Obsah Board(s), Cable(s) - - -
Série - - - -

TMP126EVM Datasheet PDF

Stáhněte si datové listy TMP126EVM PDF a dokumentaci Texas Instruments pro TMP126EVM - Texas Instruments.

Datasheets
TMP126EVM.pdf

Hodnocení zákazníků

Hodnocení: 10 články

  • Jess***Jones
    2026/04/17

    It offers good value for the price, and the specifications match the description. I’ve been using it for two days with no issues, and I’ll definitely buy it again if I need it in the future.

  • Mich***Smith
    2026/04/17

    Shipping was on time, the component pins are neatly aligned, and I tested 10 of them with a multimeter—all readings were within the specified range. Highly recommended.

  • Aman***arris
    2026/04/3

    It was great—the entire process, from placing the order to receiving the package, went very smoothly. The components were consistent, the price was fair, and I had a very pleasant shopping experience.

  • Mike***nch
    2026/04/3

    Better than expected! The resistance and capacitance readings were spot-on, and it passed the test on the first try. The service was reliable, and the packaging was thoughtful—I highly recommend it.

  • Daic***K.
    2026/03/23

    Very good. No issue after long time testing.

  • Kevi***.
    2026/03/17

    Fast switching and stable output. Very satisfied with this IC

  • Daou***hekebkeb
    2024/06/16

    I had a great experience purchasing items from Allelcoelec, I recommend

  • Uri ***al
    2024/06/19

    Good comunication,
    Transpnt regarding the process and price.

  • Yaqu***l Ali
    2024/06/19

    Providing reasonable prices, regular follow-up of orders, providing accurate and regular invoices, timely delivery of goods, excellent customer service and providing original goods and best quality materials.

  • Lea ***
    2024/06/19

    Morrey was very helpful and right on top of things!
    He replied quickly to my RFQ. He was very courteous and professional.

Napište recenzi

Vaše e -mailová adresa nebude zveřejněna.

náklad

Dodací lhůta

Položky ve skladu lze odeslat do 24 hodin.Některé části budou uspořádány k doručení do 1-2 dnů ode dne, kdy všechny položky dorazí do našeho skladu.A Allelco lodě objednávají jednou denně v 17:00, s výjimkou neděle.Jakmile je zboží odesláno, odhadovaná dodací lhůta závisí na metodách přepravy a na cíl dodání.Tabulka níže ukazuje, že je logistický čas pro některé běžné země.

Náklady na doručení

  1. Pokud máte, použijte svůj expresní účet pro zásilku.
  2. Použijte náš účet pro zásilku.Přibližné poplatky najdete v níže uvedené tabulce.
(Různé časové rámec / země / velikost balíku má odlišnou cenu.)

Metoda doručení

  1. Globální společná zásilka DHL / UPS / FedEx / TNT / EMS / SF podporujeme.
  2. Ostatní více způsobů přepravy, prosím, kontaktujte se s manažerem zákazníka.

Společné země Logistický čas
Kraj Země Logistický čas (den)
Amerika Spojené státy 5
Brazílie 7
Evropa Německo 5
Spojené království 4
Itálie 5
Oceánie Austrálie 6
Nový Zéland 5
Asie Indie 4
Japonsko 4
Střední východ Izrael 6
Odkaz na odeslání DHL & FedEx Reference
Poplatky za zásilka (kg) Reference DHL (USD $)
0,00 kg-1,00 kg $ 30,00 USD - 60,00 USD
1,00 kg-2,00 kg 40,00 USD - 80,00 USD
2,00 kg-3,00 kg 50,00 USD - 100,00 USD
Poznámka:
Výše uvedená tabulka je pouze pro informaci.Pro nekontrolovatelné faktory může mít určité zkreslení dat.
Pokud máte nějaké dotazy, kontaktujte nás.

Podpora plateb

Metoda platby lze vybrat z níže uvedených metod: Převod drátu (T/T, bankovní převod), Western Union, kreditní karta, PayPal.

Váš věrný partner dodavatelského řetězce -

Pokud máte nějaké dotazy, kontaktujte nás.

  1. Telefon
    +00852 9146 4856

Certifikace a členství

Ukázat více
TMP126EVM Image

TMP126EVM

Texas Instruments
98D-TMP126EVM

Chcete lepší cenu? Přidat do vozíku a odeslat RFQ Nyní vás okamžitě kontaktujeme.

0 RFQ
Nákupní košík (0 Items)
Je to prázdné.
Porovnejte seznam (0 Items)
Je to prázdné.
Zpětná vazba

Vaše zpětná vazba je důležitá!Na Allelco si ceníme uživatelské zkušenosti a snažíme se ji neustále zlepšovat.
Sdílejte s námi své komentáře prostřednictvím našeho formuláře zpětné vazby a budeme okamžitě reagovat.
Děkuji za výběr Allelco.

Předmět
E-mailem
Komentáře
Captcha
Přetažení nebo kliknutím na nahrávání souboru
Nahrát soubor
Typy: .xls, .xlsx, .doc, .docx, .jpg, .png a .pdf.Maximální velikost souboru
: 10 MB