Zobrazit vše

Viz anglická verze jako naši oficiální verzi.Vrátit se

Evropa
France(Français) Germany(Deutsch) Italy(Italia) Russian(русский) Poland(polski) Czech(Čeština) Luxembourg(Lëtzebuergesch) Netherlands(Nederland) Iceland(íslenska) Hungarian(Magyarország) Spain(español) Portugal(Português) Turkey(Türk dili) Bulgaria(Български език) Ukraine(Україна) Greece(Ελλάδα) Israel(עִבְרִית) Sweden(Svenska) Finland(Svenska) Finland(Suomi) Romania(românesc) Moldova(românesc) Slovakia(Slovenská) Denmark(Dansk) Slovenia(Slovenija) Slovenia(Hrvatska) Croatia(Hrvatska) Serbia(Hrvatska) Montenegro(Hrvatska) Bosnia and Herzegovina(Hrvatska) Lithuania(lietuvių) Spain(Português) Switzerland(Deutsch) United Kingdom(English)
Asie/Pacifik
Japan(日本語) Korea(한국의) Thailand(ภาษาไทย) Malaysia(Melayu) Singapore(Melayu) Vietnam(Tiếng Việt) Philippines(Pilipino)
Afrika, Indie a Střední východ
United Arab Emirates(العربية) Iran(فارسی) Tajikistan(فارسی) India(हिंदी) Madagascar(malaɡasʲ)
Jižní Amerika / Oceánie
New Zealand(Maori) Brazil(Português) Angola(Português) Mozambique(Português)
Severní Amerika
United States(English) Canada(English) Haiti(Ayiti) Mexico(español)
domůproduktyVývojové desky, sady, programátoryHodnocení a demonstrační desky a sestavyDRV8802EVM
DRV8802EVM Image
Obrázek může být reprezentace.
Viz specifikace pro podrobnosti o produktu.
VYJáDřIT MOžNOST
Metoda platby

DRV8802EVM - Texas Instruments

Výrobce Part Number
DRV8802EVM
Výrobce
Texas Instruments
Allelco Part Number
98D-DRV8802EVM
Záruka
1 rok záruka Allelco - Zjistěte více
Popis dílů
EVAL MODULE FOR DRV8802
Balík
Box
Datový list
1.DRV8802EVM.pdf ...

HTML Datasheet

DRV8802.pdf
Stav RoHs
Komf
Naše certifikace
Na skladě: 32561
  • Jednotková cena: $178.80
  • Mezisoučet: $0.00

Chcete lepší cenu?
Přidat do vozíku a odeslat RFQ Nyní vás okamžitě kontaktujeme.

Množství Jednotková cena Ext.Cena
1+ $178.80 $178.80
Výše uvedené ceny nezahrnují daně a sazby přepravy, které budou vypočteny na stránkách objednávek.
VYJáDřIT MOžNOST
Metoda platby
Naše certifikace

Specifikace

Technické specifikace DRV8802EVM
Technické specifikace Texas Instruments - DRV8802EVM, atributy, parametry a části s podobnými specifikacemi jako Texas Instruments - DRV8802EVM

Atribut produktu Hodnota atributu  
Výrobce Texas Instruments  
Využívány IC / Part DRV8802  
Typ Power Management  
dodávané Obsah Board(s)  
Série -  
sekundární atributy -  
Atribut produktu Hodnota atributu  
primární atributy Dual Full-Bridge (H-Bridge), 1.1A (1.6A Peak), 8.2V ~ 45V  
Balík Box  
Funkce Motor Controller/Driver  
Embedded Yes, MCU, 16-Bit  
Číslo základního produktu DRV8802  

Klasifikace životního prostředí a vývozu

ATRIBUT POPIS
Stav RoHs Komf
Úroveň citlivosti na vlhkost (MSL) 1 (Unlimited)
Dosáhnout stavu REACH Unaffected
ECCN EAR99
HTSUS 8473.30.1180

Díly s podobnými specifikacemi

Tři části napravo mají podobné specifikace jako Texas Instruments DRV8802EVM.

Atribut produktu DRV8802EVM DRV8803EVM DRV8801EVM DRV8801RTYT
Part Number DRV8802EVM DRV8803EVM DRV8801EVM DRV8801RTYT
Výrobce Texas Instruments Texas Instruments Texas Instruments Texas Instruments
dodávané Obsah Board(s) Board(s) Board(s) -
Embedded Yes, MCU, 16-Bit Yes, MCU, 16-Bit No -
Funkce Motor Controller/Driver Motor Controller/Driver, Stepper Motor Controller/Driver -
Využívány IC / Part DRV8802 DRV8803 DRV8800, DRV8801 -
Série - - - -
sekundární atributy - - Over Current and Crossover-Current Protection, Internal Under Voltage Lockout (UVLO) -
primární atributy Dual Full-Bridge (H-Bridge), 1.1A (1.6A Peak), 8.2V ~ 45V 1.5A @ 1 Channel, 800mA @ 4 Channels Diagnostic Output, Synchronous Rectification -
Typ Power Management Power Management Power Management -
Číslo základního produktu DRV8802 DRV8803 DRV8801 -
Balík Box Box Box -

DRV8802EVM Datasheet PDF

Stáhněte si datové listy DRV8802EVM PDF a dokumentaci Texas Instruments pro DRV8802EVM - Texas Instruments.

HTML Datasheet
DRV8802.pdf
Datasheets
CPG004 DRV88xx Guide.pdf

Hodnocení zákazníků

Hodnocení: 10 články

  • Jess***Jones
    2026/04/17

    It offers good value for the price, and the specifications match the description. I’ve been using it for two days with no issues, and I’ll definitely buy it again if I need it in the future.

  • Mich***Smith
    2026/04/17

    Shipping was on time, the component pins are neatly aligned, and I tested 10 of them with a multimeter—all readings were within the specified range. Highly recommended.

  • Aman***arris
    2026/04/3

    It was great—the entire process, from placing the order to receiving the package, went very smoothly. The components were consistent, the price was fair, and I had a very pleasant shopping experience.

  • Mike***nch
    2026/04/3

    Better than expected! The resistance and capacitance readings were spot-on, and it passed the test on the first try. The service was reliable, and the packaging was thoughtful—I highly recommend it.

  • Daic***K.
    2026/03/23

    Very good. No issue after long time testing.

  • Kevi***.
    2026/03/17

    Fast switching and stable output. Very satisfied with this IC

  • Daou***hekebkeb
    2024/06/16

    I had a great experience purchasing items from Allelcoelec, I recommend

  • Uri ***al
    2024/06/19

    Good comunication,
    Transpnt regarding the process and price.

  • Yaqu***l Ali
    2024/06/19

    Providing reasonable prices, regular follow-up of orders, providing accurate and regular invoices, timely delivery of goods, excellent customer service and providing original goods and best quality materials.

  • Lea ***
    2024/06/19

    Morrey was very helpful and right on top of things!
    He replied quickly to my RFQ. He was very courteous and professional.

Napište recenzi

Vaše e -mailová adresa nebude zveřejněna.

náklad

Dodací lhůta

Položky ve skladu lze odeslat do 24 hodin.Některé části budou uspořádány k doručení do 1-2 dnů ode dne, kdy všechny položky dorazí do našeho skladu.A Allelco lodě objednávají jednou denně v 17:00, s výjimkou neděle.Jakmile je zboží odesláno, odhadovaná dodací lhůta závisí na metodách přepravy a na cíl dodání.Tabulka níže ukazuje, že je logistický čas pro některé běžné země.

Náklady na doručení

  1. Pokud máte, použijte svůj expresní účet pro zásilku.
  2. Použijte náš účet pro zásilku.Přibližné poplatky najdete v níže uvedené tabulce.
(Různé časové rámec / země / velikost balíku má odlišnou cenu.)

Metoda doručení

  1. Globální společná zásilka DHL / UPS / FedEx / TNT / EMS / SF podporujeme.
  2. Ostatní více způsobů přepravy, prosím, kontaktujte se s manažerem zákazníka.

Společné země Logistický čas
Kraj Země Logistický čas (den)
Amerika Spojené státy 5
Brazílie 7
Evropa Německo 5
Spojené království 4
Itálie 5
Oceánie Austrálie 6
Nový Zéland 5
Asie Indie 4
Japonsko 4
Střední východ Izrael 6
Odkaz na odeslání DHL & FedEx Reference
Poplatky za zásilka (kg) Reference DHL (USD $)
0,00 kg-1,00 kg $ 30,00 USD - 60,00 USD
1,00 kg-2,00 kg 40,00 USD - 80,00 USD
2,00 kg-3,00 kg 50,00 USD - 100,00 USD
Poznámka:
Výše uvedená tabulka je pouze pro informaci.Pro nekontrolovatelné faktory může mít určité zkreslení dat.
Pokud máte nějaké dotazy, kontaktujte nás.

Podpora plateb

Metoda platby lze vybrat z níže uvedených metod: Převod drátu (T/T, bankovní převod), Western Union, kreditní karta, PayPal.

Váš věrný partner dodavatelského řetězce -

Pokud máte nějaké dotazy, kontaktujte nás.

  1. Telefon
    +00852 9146 4856

Certifikace a členství

Ukázat více
DRV8802EVM Image

DRV8802EVM

Texas Instruments
98D-DRV8802EVM

Chcete lepší cenu? Přidat do vozíku a odeslat RFQ Nyní vás okamžitě kontaktujeme.

0 RFQ
Nákupní košík (0 Items)
Je to prázdné.
Porovnejte seznam (0 Items)
Je to prázdné.
Zpětná vazba

Vaše zpětná vazba je důležitá!Na Allelco si ceníme uživatelské zkušenosti a snažíme se ji neustále zlepšovat.
Sdílejte s námi své komentáře prostřednictvím našeho formuláře zpětné vazby a budeme okamžitě reagovat.
Děkuji za výběr Allelco.

Předmět
E-mailem
Komentáře
Captcha
Přetažení nebo kliknutím na nahrávání souboru
Nahrát soubor
Typy: .xls, .xlsx, .doc, .docx, .jpg, .png a .pdf.Maximální velikost souboru
: 10 MB